Adequate view out
BREEAM UK New Construction, Non-domestic Buildings (United Kingdom), Technical Manual, SD5078: BREEAM UK New Construction 2018 3.0, published by BRE Global Limited, defines an adequate view out as:
‘Where relevant building areas are within 8m of an external wall which has a window or permanent opening, and the window or opening is ≥ 20% of the surrounding wall area. Where the room depth is greater than 8m, the percentage of window or opening must instead be the same as, or greater than, the values in Table 1.0 BS8206: Part 2. The view out must be a view of a landscape or buildings (rather than just the sky) at seated eye level (1.2– 1.3m) within the relevant building areas and should ideally be through an external window. A view into an internal courtyard or atrium will comply provided the distance from the opening to the back wall of the courtyard or atrium is at least 10m (therefore allowing enough distance for the eyes to refocus). The view cannot be an internal view across the room, as this is likely to become obstructed by partitions, filing cabinets etc. In addition to this, an external view out can offer positive effects on health and wellbeing that cannot be offered by an internal view.’
[edit] Related articles on Designing Buildings Wiki
- Birds and building collisions.
- BRE articles.
- BREEAM Visual comfort View out.
- BREEAM.
- Building Research Establishment.
- Light obstruction notice.
- London View Management Framework.
- Openable window area.
- Right to a view.
- Rights to light.
- Strategic view.
- Value in the view: conserving historic urban views.
- View.
- Window.
- Zone of theoretical visibility.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
ECA's public affairs priorities
Member consultation opens to shape priorities for 2027 to 2030.
Dutyholder responsibilities from 1 July 2026.
Where performance meets practice
The Building Envelope Stage at UKCW Birmingham.
CIAT publishes briefing on planning reforms.
Leaders in Learning for Practice Network
Call for conservation leaders in learning to register interest in new network.
The importance of early engagement
Construction lessons from the Trillium HealthWorks Experience Centre.
Mayors are to be given planning call in powers
Mayors across England will be able to make the most important planning decisions.
The Master Builder: William Butterfield and his times. Book review.
Why construction can't afford to ignore the skills gap.
Building Safety Regulator, 19 August
Gill Kernick appointed Independent Chair of Residents’ Panel.
Connecting knowledge, technology and conservation
Building competence for the future of built heritage.
Building Regulations and Building Safety Act
CIOB publishes free advice for non-domestic clients.